Air Conditioning Absorption

Using cogeneration to produce hot water for heating systems is widespread in all of India. Since the demand for heating varies according to the seasons, a cogeneration systems would not be profitable if heat generated by the cogeneration modules were not used in the summer.

In summer, what really needed is cold water for air conditioning, and this is usually obtained by means of high power-consuming refrigerating compressors.

An effective alternative presently consists in using absorption machines (chillers) which are fed with hot water from the cogeneration modules and provide cold water without any draw on electric energy.This makes it possible to get a uniform curve of the cogeneration receiving facilities’ heat energy demand and to reduce the electricity bill at the same time. The system is successfully used in air conditioning plants for the tertiary sector as well as in important industrial applications, such as the food chemical annd other industries.

This is to certify that Six nos. Biogas Gensets of various capacities have been installed at our different plants.One of the Gensets has operated over 50,000 Hrs. in the last few years. GGE has also carried our O&M of this plant.

 

This is to certify that we have been operating a Guascor Biogas genset of 945 KWe since Jan 2012. The engine is operating continuously on base load of approx. 75 % to 80 %. GGE Genset is providing outstanding service and spare parts support for the product.

This is to certify that we had purchased 2 nos. 945 Kwe natural Gas Gensets from M/s. GGE Genset Pvt. Ltd. Both the gensets has crossed 30,000 Hrs of running. Both the Gensets are under O&M contract with GGE and sunning well. We are quite satisfied with the services provided by GGE.